Ace Hardware Distribution Center

At 1.5 million SF, the new Ace Hardware Distribution Center in Kansas City stands as one of the largest industrial builds in the region and a key node in the company’s national distribution network. The scale of the building drove the engineering approach across every discipline.

MEPFP Engineering covered mechanical, electrical, plumbing, and fire protection systems, alongside site lighting design and coordination of utility services to the building. Fire protection was developed as a performance-based design with detailed zone drawings calibrated to the demands of a large-scale distribution environment.

Location:
Kansas City, MO

Client Type:
General Contractor

Size:
1,500,000 SF

Market:
Industrial

Services Provided:
MEPFP Engineering

Ready to start your next project?

Connect with G&W Engineering to see how we can help.