NGA West Access Points

The access point buildings for the new NGA West campus in St. Louis carry the security envelope for a federal facility, which puts the air barrier under real scrutiny: it has to be installed to spec and verified, not assumed. Air barrier performance is easy to compromise during installation and hard to correct once cladding closes it in, so independent inspection during the work is where the value lands.

G&W’s scope followed the air barrier from documentation through installed verification. Pre-construction review covered the specifications, drawings, submittals, and manufacturer requirements, and an initial site visit assessed substrate readiness before application. Three installation observation visits confirmed conformance with the manufacturer’s requirements, including wet film thickness checks during application, and adhesion testing per ASTM D4541 verified bond on the installed barrier. Each visit produced a written report of observations and test results measured against the project specification.

Location:
St. Louis, MO

Client Type:
General Contractor

Testing Scope:
Fluid-applied air barrier at access point buildings, 4 test locations

METHODS & STANDARDS

ASTM D4541

Barrier bond strength to substrate

Wet Film Thickness

Applied thickness meets specification

Manufacturer Conformance Review

Installation matches approved submittal data

OUR APPROACH

Pre-Construction Review

Specifications, submittals, manufacturer requirements

Substrate Assessment

Readiness before application

Installation Observation

Three visits, wet film thickness checks

Adhesion Testing

Four pull tests, single visit

Reporting

Written report each visit