MidAmerica St. Louis Airport Terminal Expansion

The terminal expansion at MidAmerica St. Louis Airport added roughly 41,000 square feet across two stories and a below-grade level. Glazed aluminum windows and curtainwall formed much of the exterior, and on a building like this, a glazing system that lets in air or water becomes a problem that shows up during operation, when it is far harder to reach and fix.

Testing followed specification section 084413. The curtainwall was checked first at an on-site mock-up, then again on the installed system in the field. Both rounds ran to AAMA 503, using air infiltration and spray water tests under pressure differential. Field testing covered three mobilizations at two tests each, with a written report after every round.

Location:
Mascoutah, IL

Testing Scope:
Glazed aluminum windows and curtainwall, mock-up plus field testing

METHODS & STANDARDS

AAMA 503

Installed curtainwall performance verified

ASTM E783

Installed window and door air leakage

ASTM E1105

Installed fenestration water penetration verified

OUR APPROACH

Pre-Construction Meeting

Section 084413 scope, design team review

Mock-Up Testing

On-site glazing assembly, AAMA 503

Installed Field Testing

Three mobilizations, two tests each

Air and Water Procedures

E783 infiltration, E1105 pressure differential

Written Reporting

Results delivered per mobilization