Family Care Health Centers South City Expansion

A new two-story, 27,000 SF family health center clad in brick and metal panel over metal framing relies on a liquid-applied air barrier behind two different cladding types, and each type covers the barrier in a different way. Verifying the barrier before masonry and metal panel go up is the only practical window to confirm it was installed to the manufacturer’s requirements.

G&W scheduled testing around that sequence, with one visit behind the masonry cladding and one behind the metal panel cladding. Each visit paired visual observation of the installed barrier against project documents with dry film thickness readings in four areas and adhesion testing per ASTM D4541. Written reports documented observations, conditions, and test results for each visit.

ASTM D4541

Membrane Thickness & Adhesion Testing

Location:
St. Louis,  MO

Client Type:
MEPFP Contractor

Testing Scope:
Air barrier adhesion and film thickness, 2 floors

Market:
Healthcare

OUR APPROACH

Sequencing

Testing staged to cladding installation

Masonry Phase Testing

Behind brick, before veneer

Metal Panel Phase Testing

Behind panel, before install

Verification

Dry film thickness, four areas each

Reporting

Per phase

FIELD WORK

Ready to start your next project?

Tell us what you're planning and we'll connect you with the right team.